Data Center Construction Infrastructure Project Manager
Company: Cable Solutions, LLC
Location: Chicago
Posted on: May 4, 2025
Job Description:
Position: Data Center Construction Infrastructure Project
ManagerLocation: Chandler, AZJob Id: 281# of Openings: 2Job
Summary: The Data Center Construction Infrastructure Project
Manager will be responsible for managing all aspects of data center
construction projects, ensuring they are completed on time, within
budget, and to the required quality standards. This role involves
collaboration with cross-functional teams, contractors, and
stakeholders to deliver innovative and efficient data center
facilities.Job Duties and Responsibilities:Project Planning and
Management:
- Develop detailed project plans, including scope, schedule, and
budget.
- Coordinate with stakeholders to define project objectives and
deliverables.
- Lead cross-functional teams, including engineers, architects,
contractors, and vendors.
- Foster a collaborative team environment to achieve project
goals.Budget and Resource Management:
- Manage project budgets, ensuring effective resource allocation
and cost control.
- Monitor and report on financial performance, identifying any
variances.
- Identify potential risks and develop mitigation
strategies.
- Ensure compliance with safety standards and regulatory
requirements.Quality Assurance:
- Oversee construction activities to ensure adherence to design
specifications and quality standards.
- Conduct regular site inspections and audits.Communication and
Reporting:
- Maintain open communication with all stakeholders, providing
regular updates on project status.
- Prepare and present project reports to senior management.
- Evaluate and select contractors and vendors.
- Negotiate contracts and manage relationships with external
partners.Job Knowledge, Skills, and Abilities:
- Strong project management skills with a proven track record of
delivering complex projects on time and within budget.
- In-depth knowledge of data center infrastructure systems,
including power distribution, HVAC, fire suppression, and physical
security.
- Excellent communication and interpersonal skills, with the
ability to collaborate effectively across teams and
disciplines.
- Proficiency in project management software and tools (e.g., MS
Project, Primavera).
- Understanding of regulatory requirements and building codes
related to data center construction.Education and Experience:
- Bachelor's degree in Construction Management, or equivalent
combination of education and experience.
- At least 5 years of experience in managing construction
projects within the data center or critical infrastructure
sector.
- Certification in Project Management Professional (PMP) or
equivalent preferred.
- Experience with green building certifications (e.g.,
LEED).
- Familiarity with cloud computing technologies and their impact
on data center design and construction.
- Experience with BIM (Building Information Modeling) is
preferred.Physical Requirements:The employee must regularly lift
and/or move up to 50 pounds. Specific vision abilities required by
this job include close vision. While performing the duties of this
job, the employee is regularly required to stand; use hands to
finger, handle, or feel; reach with hands and arms; climb or
balance; stoop, kneel, crouch, or crawl; and talk or hear.The work
environment characteristics described here are representative of
those an employee encounters while performing the essential
functions of this job. Reasonable accommodations may be made to
enable individuals with disabilities to perform the essential
functions.The duties and responsibilities described above are not a
comprehensive list and additional tasks may be assigned as the
scope of the position may change as necessitated by business
demands.
#J-18808-Ljbffr
Keywords: Cable Solutions, LLC, Bartlett , Data Center Construction Infrastructure Project Manager, Executive , Chicago, Illinois
Didn't find what you're looking for? Search again!
Loading more jobs...